Public Lighting Revitalization in Rakvice

Complete replacement and expansion of public lighting with nearly 68% energy savings and CO₂ emission reduction of 93 tonnes per year. The grant covered 93% of the investment.

event_available

Completion of works:

2023

light_mode

Number of luminaires:

263

Public Lighting Revitalization in Rakvice

Modern LED Lighting in the Municipality with Nearly 93% Grant Funding

As part of this investment project, we carried out a complete modernization of the lighting system to increase energy efficiency, improve lighting conditions, and reduce operating costs.

A total of 263 luminaires were replaced and added, including:

  • 256 luminaires replaced with modern LED technology
  • 7 new luminaires installed to ensure optimal lighting levels

Thanks to these measures, we achieved energy savings of 67.74% compared to the original state. The new LED lighting not only ensures significantly lower energy consumption but also offers longer service life and consistent light output.

The grant covered nearly 93% of the total investment costs.

The project also delivered significant environmental benefits, reducing CO₂ emissions by 93.457 tonnes per year. The result is efficient, economical, and environmentally friendly lighting that provides the municipality with long-term operational savings and improved lighting comfort.

Our realization of LED lighting

Selection of public lighting projects

We have implemented public lighting projects in dozens of municipalities throughout the Czech Republic.

Boleradice
Lovčice
Ivaň
Kobylnice
Vilémov
Rostěnice-Zvonovice
Břeclav
Odry - etapa IV
Nechvalín
Pouzdřany
Dobratice
Velké Hostěrádky
Ždánice - etapa II
Odry - etapa III
Odry - etapa II
Milešovice
Strážovice
Vranovice
Brankovice
Ždánice - etapa I
Drnholec
Rakvice
Odry - etapa I
Medlov
Kozlany

Ivaň

Implementation:
2025
Subsidies:
1 058 009
Google maps

Drnholec

Implementation:
2025
Subsidies:
1 781 759
Google maps

Boleradice

Implementation:
2023
Subsidies:
606 240
Google maps

Nechvalín

Implementation:
2023
Subsidies:
393 390
Google maps

Vranovice

Implementation:
2023
Subsidies:
2 047 590
Google maps

Rakvice

Implementation:
2023
Subsidies:
3 207 870
Google maps

Vilémov

Implementation:
2022
Subsidies:
494 849
Google maps

Pouzdřany

Implementation:
2021
Subsidies:
905 916
Google maps

Rostěnice-Zvonovice

Implementation:
2021
Subsidies:
672 224
Google maps

Milešovice

Implementation:
2021
Subsidies:
676 839
Google maps

Velké Hostěrádky

Implementation:
2021
Subsidies:
717 633
Google maps

Kobylnice

Implementation:
2020
Subsidies:
1 129 300
Google maps

Břeclav

Implementation:
2020
Subsidies:
1 736 000
Google maps

Ždánice - etapa II

Implementation:
2020
Subsidies:
1 036 800
Google maps

Dobratice

Implementation:
2020
Subsidies:
1 346 200
Google maps

Odry - etapa IV

Implementation:
2020
Subsidies:
1 400 000
Google maps

Odry - etapa III

Implementation:
2019
Subsidies:
1 400 000
Google maps

Strážovice

Implementation:
2019
Subsidies:
1 457 800
Google maps

Brankovice

Implementation:
2019
Subsidies:
1 487 200
Google maps

Ždánice - etapa I

Implementation:
2019
Subsidies:
1 342 870
Google maps

Kozlany

Implementation:
2019
Subsidies:
548 620
Google maps

Lovčice

Implementation:
2018
Subsidies:
846 320
Google maps

Odry - etapa II

Implementation:
2018
Subsidies:
1 200 000
Google maps

Medlov

Implementation:
2018
Subsidies:
Bez dotace
Google maps

Odry - etapa I

Implementation:
2017
Subsidies:
895 000
Google maps