Photovoltaic Grants for Companies 2025

Get 30% of PV Costs

Utilize the new grant call from the Modernization Fund of the State Environmental Fund of the Czech Republic and get up to 30% of total costs for your photovoltaic project!

Photovoltaics Grants 2025

Call RES+ No. 1/2025 – Photovoltaic Power Plants up to 5 MWp with Own Consumption

This grant call represents an ideal opportunity for industrial enterprises, production plants and other commercial entities.

Why is this call interesting for your company?

With support up to 30% of total eligible expenses, the return period of your investment in a photovoltaic power plant is significantly shortened, making the entire project economically more attractive.

Based on our experience with implemented projects, the return on investment in photovoltaics using grants usually ranges between 5-7 years.

Alternative Energy Systems will ensure the complete process from consumption analysis, through engineering documentation, grant processing, to implementation and subsequent grant monitoring.

Photovoltaics with grant support will help you:

task_alt

Reduce electricity costs at a time when energy prices are significantly rising

task_alt

Increase your energy self-sufficiency and be less dependent on grid supplies

task_alt

Effectively use roof areas or land for producing your own electricity

task_alt

Contribute to ecological operation of your company and improve your ESG profile

Basic Conditions of Call RES+ 1/2025

For detailed consultation of specific technical parameters and call limitations, don't hesitate to contact us.

Call RES+ No. 1/2025 Conditions - Applicant

Who can apply for the grant?

The grant is intended for a wide spectrum of entities from the business sector. The applicant can be practically any company - from small limited liability companies to large industrial enterprises, regardless of the legal form of business.

The basic prerequisite is meeting one of the following conditions:

task_alt

You are an existing license holder for business in energy sectors (i.e., you have a license for electricity production) or will become one during project implementation

task_alt

You don't have a license, but photovoltaic power plant operation will be contractually secured with an entity that owns this license. This solution is ideal for companies that don't want to deal with licensing and prefer cooperation with a licensed partner

task_alt

You fall into the category of entities where license holding obligation according to current legislation is not necessary. This may apply to smaller production sources according to current legislation

Additional Important Information

Besides commercial entities, municipalities, city districts, regions, public institutions, schools, research organizations and non-profit entities can also apply for grants. For these organizations, preferential conditions apply - they can implement projects from 10 kWp capacity (instead of standard 50 kWp).

It's also important to know that unlike previous grant calls, for application submission it's not necessary to have an issued building permit - it's sufficient to document only the initiation of building proceedings. This significantly simplifies the entire process and speeds up the possibility of application submission.

Alternative Energy Systems will help you determine which category you fall into and ensure all necessary documents for proving grant eligibility. If needed, we can also recommend suitable licensed partners for operating your photovoltaic power plant.

Call RES+ No. 1/2025 Conditions - Use

What can the grant be used for?

Besides photovoltaics itself, you can also get support for battery systems or hydrogen production equipment, which perfectly fits into our portfolio of comprehensive energy solutions.

Basic photovoltaic power plant components:

task_alt

Photovoltaic panels - devices that convert solar radiation into electrical energy

task_alt

Inverters - devices that change direct current from panels to alternating current for use in buildings

task_alt

Mounting systems - systems for fixing panels on roofs or land

task_alt

Electrical installation material - cables, switchboards and other elements necessary for functional connection

task_alt

Measurement and regulation systems - devices for monitoring and controlling electricity production and consumption

Supplementary technologies:

task_alt

Battery storage systems - devices for storing excess energy produced during the day for use when the sun isn't shining

task_alt

Systems for hydrogen production by water electrolysis - technology that uses produced electricity to produce hydrogen as a clean energy carrier

Additional Important Information

These supplementary technologies represent an interesting opportunity for maximizing produced electricity use and optimizing project economics.

Battery systems enable storing excess energy for later use, while electrolyzers supported within this call convert electricity surpluses into hydrogen, which can be stored long-term or used in transport or industry.

Alternative Energy Systems offers comprehensive services in design and installation of both photovoltaic systems and supplementary technologies. Thanks to our experience, we can assess which solution is most suitable for your specific project from technical and economic perspectives.

Call Overview

Summary of Key Points of Call
RES+ No. 1/2025

Technical and financial grant parameters:

task_alt

Support amount: up to 30% of total eligible project expenses

task_alt

Supported capacities: 50-5000 kWp (for regular companies), 10-5000 kWp (for public sector and in Prague

task_alt

Grant focus: photovoltaic power plants with emphasis on own consumption of produced electricity

task_alt

Supplementary technologies: battery systems and electrolyzers for hydrogen production

task_alt

Applicants: companies, public sector and non-profit organizations

task_alt

Geographic limitation: projects must not be implemented on quality agricultural land

task_alt

Technical requirements: quality components with long-term warranty

Process and administration:

task_alt

Evaluation method: continuous (projects are evaluated in the order they were submitted)

task_alt

Process simplification: for application submission, it's sufficient to document initiation of building proceedings

task_alt

Support payment: ex-post (after implementation and documentation of all required documents)