Czech Republic
08/2026
–
10/2026
97.9
kWp

For the municipality of Kozlany in the South Moravian Region, we designed and built two separate rooftop photovoltaic power plants. The plant on the municipal office has an output of 48.4 kWp and the one on the municipal hostel 49.5 kWp. Each has its own battery storage with a capacity of 46.08 kWh.
The plants consist of a total of 178 monocrystalline Trina Solar panels with an output of 550 Wp, 88 on the municipal office and 90 on the hostel. The panels face south-west and south-east and are screwed to the roof rafters.
The electricity generated is used primarily for the buildings’ own consumption. Surplus electricity will be fed into the EG.D distribution grid, and the municipality will use it at its other supply points. The project is part of Kozlany’s municipal energy scheme.
Each building has a 50 kW Deye hybrid inverter and a Deye BOS-G45-Pro battery storage system made up of nine 5.12 kWh LiFePO₄ modules. The inverter and batteries are protected by a canopy and fencing.
The installation includes Tigo optimizers with Rapid Shutdown. They optimize the output of individual panels and, in the event of a power outage, reduce the DC voltage of the strings to a safe level within 30 seconds.
The installation also included modifications to the existing main and meter distribution boards. At the hostel, we also modified the air-termination system and lightning protection according to the new design.
The expected annual generation of both plants is 97.05 MWh, of which 47.34 MWh at the municipal office and 49.71 MWh at the hostel.
The project was supported by the Modernisation Fund under the RES+ call No. 3/2022.