We successfully implemented the installation from May to July 2024.
On an area of 950 m², 197 pieces of Longi photovoltaic panels with 500 Wp capacity were installed. For efficient solar energy management, Sungrow SG125CX inverters were used, which ensured optimal system operation without the need for battery storage.
This project was completely implemented from the investor's own resources
The project was designed to meet the energy demands of the industrial facility, with emphasis placed on long-term reliability and efficiency of the installed system.
Area
950
m²
Implementation Period
05/2024
–
07/2024
Country of Implementation
Czech Republic
Power Plant Capacity
98.5
kWp
Grant Amount
0
Kč
Technologies Used
197 pieces Longi 500 Wp
Sungrow SG125CX
Photovoltaics
See also other successful photovoltaic projects for companies.

For the winery Domaine Eisgrub Vinné Sklepy Lednice we installed a 10.45 kWp photovoltaic system with 20.48 kWh of battery storage across two roofs.

Solar power plant on both the hall roof and the ground reduces the facility's energy intensity. Turnkey general contracting from earthworks to commissioning in 2026.

We installed a PV system with battery storage on the roof of the VHS Břeclav building to power the workshops, office air conditioning, and electric vehicle charging.

In summer 2025, we installed a 49.5 kWp PV system on the 300 m² rooftop of a construction company's headquarters in Hodonín.

We implemented an extensive 530 kWp photovoltaic power plant on five roofs of East Bohemian Gas Engineering Plants.

The third phase of photovoltaic power plant implementation for BRM AERO.

In 2023, we installed a photovoltaic power plant on a shopping center roof in Zlín.

In 2023, we installed a photovoltaic power plant on the hall roof at KOVO - Mazánek s.r.o. facility in Tatobity.

As part of the project for Moravia Cans industrial facility, a 299.92 kWp photovoltaic power plant was successfully installed.

Implementation of the second phase of photovoltaic power plant construction at BRM AERO facility in 2023.

We installed a 613.64 kWp photovoltaic power plant in the industrial facility in Sezimovo Ústí.

Construction of photovoltaic power plant at Munters Czech s.r.o. industrial facility - Kapřiska site in 2022 and 2023.

We installed a 299.82 kWp photovoltaic power plant on the industrial hall roof at Filák facility in Vlkoš.

Implementation of the second phase of photovoltaic power plant on the roof at LUVE-PLAST industrial facility.

In 2022, we implemented two PV systems for Pekárny Moravec, each with 54 kWp capacity. They are installed on buildings in two locations. The system provides clean electricity for bakery production.

Photovoltaic power plant with storage - energy independence for Harmonikas manufacturing facility.
.webp)
Installation of 99.56 kWp photovoltaic power plant on operational building roof at BRM AERO facility.
Articles
Solar power plant insights: options, tips, news and our procedures.
Article
Article
Article
Alternative Energy Systems a.s.
Hlinky 45/114, 603 00 Brno - Pisárky
REGISTRATION NUMBER: 04381866, TAX NUMBER: CZ04381866
Led Lighting
Grants & Subsidies
Interesting topics
© Aleners Energy systems a.s. 2025/content & web design David Navrátil, Younick

_01_(1200).webp)
_04_(1200).webp)
_06_(1200).webp)
_09_(1200).webp)
_10_(1200).webp)
_13_(1200).webp)
_17_(1200).webp)
_18_(1200).webp)
_19_(1200).webp)
_20_(1200).webp)
_22_(1200).webp)
_24_(1200).webp)
_05_(1200).webp)