Česko
05/2024
–
07/2024
98.5
kWp
We successfully implemented the installation from May to July 2024.
On an area of 950 m², 197 pieces of Longi photovoltaic panels with 500 Wp capacity were installed. For efficient solar energy management, Sungrow SG125CX inverters were used, which ensured optimal system operation without the need for battery storage.
This project was completely implemented from the investor's own resources
The project was designed to meet the energy demands of the industrial facility, with emphasis placed on long-term reliability and efficiency of the installed system.