08/2022
–
12/2022
162.26
kWp
On the industrial hall of LUVE-PLAST, s.r.o. in Kelčany, the second phase of photovoltaic power plant construction with 162.26 kWp capacity took place.
On a total area of 1,450 m², 427 pieces of JA Solar 380 Wp photovoltaic panels were installed, which ensure efficient electricity production. This project uses cutting-edge Fronius Tauro inverter technology for efficient solar energy conversion.
Construction took place from August 2022 to December 2022 and was supported by a grant of CZK 1,200,700.
The project was designed to maximize solar potential utilization of the given location and ensure long-term sustainability of the industrial facility's energy needs.