Česko
06/2023
–
11/2023
355.5
kWp
Construction of the photovoltaic power plant without battery storage took place from June to November 2023. On a total area of 2,750 m², 935 pieces of JA Solar 380 Wp photovoltaic panels were installed, which ensure efficient electricity production. This project uses cutting-edge Fronius Tauro and Fronius Symo inverter technology for efficient solar energy conversion.
Construction was supported by a grant of CZK 2,636,300 for the purpose of reducing overall energy dependence of operations.
The project was designed to maximize solar potential utilization of the given location and ensure long-term sustainability of the industrial facility's energy needs.